New quartz countertops can transform a kitchen or bathroom, but most homeowners want to know one thing before they commit: how long will it take? Whether you’re in Salt Lake County, Utah County, or elsewhere along the Wasatch Front, the process follows a similar path: measure, template, fabricate, and install.
Here’s what each step looks like, how long it usually takes, and what you can do to keep your project on schedule.
The Typical Quartz Countertop Timeline at a Glance
- Initial measure and quote: a few days to schedule
- Choosing your slab: as fast as you can decide
- Templating: usually a short visit, once cabinets are installed
- Fabrication: often around one to two weeks after templating
- Installation: usually done in a single day for most kitchens
- Plumbing hookup: after install, once adhesives have set
From template to install, many projects take about one to three weeks. Timing varies by shop workload, slab availability, project size, and time of year, so ask for a schedule estimate when you get your quote.
Step 1: Initial Measure and Quote
It all starts with rough measurements of your counters. Some shops can quote from your own measurements or a simple sketch; others will send someone out. At this stage you’ll talk about:
- The layout and approximate square footage
- Sink type and number of cutouts
- Edge profile and backsplash
- Whether old countertops need to be removed
Once you approve the quote, you’ll usually pay a deposit to reserve material and get on the schedule.
Step 2: Choosing Your Quartz Slab
You’ll pick a color and pattern, often from samples or by visiting a slab yard or showroom. Popular colors are usually in stock, but specialty or designer colors may need to be ordered, which can add time. If you’re on a tight schedule, ask which colors are available now.
Step 3: Templating
Templating is where precise measurements are taken so the quartz fits your space exactly. A technician will measure your cabinets and walls, often using digital tools or physical templates, and mark sink and appliance locations.
Before templating, make sure:
- Base cabinets are fully installed, level, and secured
- Your sink is on site (especially for undermount sinks)
- You have specs for your faucet, cooktop, or slide-in range
- Old countertops are removed, if your installer requires it before templating
Templating usually takes an hour or two for a typical kitchen. Someone over 18 should be home to answer questions and confirm details like seam placement and overhangs.
Step 4: Fabrication
After templating, the shop cuts your slab to size, shapes the edges, cuts openings for sinks and cooktops, and polishes everything. For many projects, fabrication takes around one to two weeks, though it can be faster or slower depending on how busy the shop is and how complex your layout is.
In Utah, spring and summer remodeling season can mean longer wait times, so it helps to book early if you’re working toward a deadline like a move-in date or holiday.
Step 5: Installation Day
For most kitchens, installation is done in a single day, often in just a few hours. Larger kitchens, big islands, or multiple bathrooms may take longer. On install day, expect:
- The crew bringing in the finished pieces and setting them on your cabinets
- Leveling, seaming, and securing the countertops
- Mounting undermount sinks
- Cleanup of the work area
How to prepare:
- Clear the counters, cabinets near the work area, and a path from the door to the kitchen
- Keep kids and pets out of the work area
- Plan for some dust and noise
- Make sure there’s parking close to your entry for the install truck
Step 6: After Installation
Adhesives and seam fillers need time to set. Your installer will tell you how long to wait before reconnecting plumbing and using the sink, often around 24 hours. Many installers don’t handle plumbing, so you may need to schedule a plumber to reconnect the sink, faucet, and disposal.
Once everything is set, quartz is ready for everyday use. No sealing is needed. Just wipe it down with mild soap and water.
What Can Delay Your Project?
- Cabinets not fully installed or level at templating
- Sink or appliance specs not available
- Special-order slabs
- Layout changes after templating
- Busy-season backlogs
- Winter weather affecting travel to mountain or rural areas
Tips for a Smooth Install
- Make final decisions on sink, faucet, and appliances before templating.
- Coordinate your plumber and backsplash tile installer ahead of time.
- Ask for a written timeline with your quote.
- Plan for a short period without a working kitchen sink.